From: | Peter Johansson |
Subject: | tests using multiple processes |
Date: | Tue, 02 Jul 2013 09:13:54 +1000 |
User-agent: | Mozilla/5.0 (X11; Linux x86_64; rv:10.0.12) Gecko/20130108 Thunderbird/10.0.12 |
Hi automakers.I have a test-suite (with automake parallel) in which some of the test cases run multithreaded applications and therefore use eg four CPUs. In order to avoid total overload I currently reduce number of jobs e.g. 'make -j2' rather than 'make -j8', which is sort of waste because it means that for part of test the load is only 25%. Is there a way/trick anyone has come up with to tell Make that "OK this test should allocate 4 jobs, while these jobs only need one job each".
Cheers, Peter