[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Caching test results separately?
From: |
Dr. Arne Babenhauserheide |
Subject: |
Caching test results separately? |
Date: |
Mon, 13 Mar 2023 19:31:34 +0100 |
User-agent: |
mu4e 1.8.13; emacs 28.1 |
Hi,
A large part of the build time is being consumed by tests … could we
separate those phases so a package whose tests succeeded once does not
have to be rebuild just because its package got garbage collected?
(⇒ keep the test result (boolean) longer than the build result)
Keeping just a boolean that says whether the tests for a given hash
succeeded could make that pretty cheap and it could avoid half the build
time for packages that got garbage collected before.
Best wishes,
Arne
--
Unpolitisch sein
heißt politisch sein,
ohne es zu merken.
draketo.de
signature.asc
Description: PGP signature
- Caching test results separately?,
Dr. Arne Babenhauserheide <=