info-cvs
[Top][All Lists]
Advanced

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Changes made to project


From: Murrgon
Subject: Re: Changes made to project
Date: Wed, 14 Jul 2004 15:07:22 -0400
User-agent: Mozilla Thunderbird 0.7.2 (Windows/20040707)

Hmmm, yeah I think I'm gonna need some different method.  The problem
is that the machine doing the check for differences does not have the
project checked out to a sandbox so doing a diff won't work.

Bascially what I want to do is set up a build machine that can check
for changes made to the project, and if there are any it will check
out the code and build it.  It does a fresh check out each time and
wipes the sandbox after it is finished.

Jim.Hyslop wrote:
Murrgon wrote:

Is there a way to determine if there have been any commits or adds
done to a project since a specific date or tag?


Do you mean besides using the -r or -d options to diff/log/update?



reply via email to

[Prev in Thread] Current Thread [Next in Thread]