[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[Octave-bug-tracker] [bug #50924] Different result between range operati
From: |
anonymous |
Subject: |
[Octave-bug-tracker] [bug #50924] Different result between range operation and vector operation |
Date: |
Wed, 3 May 2017 04:11:59 -0400 (EDT) |
User-agent: |
Mozilla/5.0 (X11; Linux x86_64; rv:53.0) Gecko/20100101 Firefox/53.0 |
URL:
<http://savannah.gnu.org/bugs/?50924>
Summary: Different result between range operation and vector
operation
Project: GNU Octave
Submitted by: None
Submitted on: Wed 03 May 2017 08:11:58 AM UTC
Category: Interpreter
Severity: 3 - Normal
Priority: 5 - Normal
Item Group: Incorrect Result
Status: None
Assigned to: None
Originator Name: Arthur HUGEAT
Originator Email: address@hidden
Open/Closed: Open
Discussion Lock: Any
Release: 4.2.1
Operating System: GNU/Linux
_______________________________________________________
Details:
When I use a range or with a vector, I haven't the same result.
n = 20480;
step = 2 * pi * 1/250e6 * 10e6;
tmp1 = step * (1:n);
tmp2 = step * [1:n];
max(abs(tmp1 - tmp2)) # Must be equal to 0
I have tested this script with octave 3.8, 4.0 and 4.2, this bug occurs but
with matlab 7.11 I obtain the right result.
_______________________________________________________
File Attachments:
-------------------------------------------------------
Date: Wed 03 May 2017 08:11:58 AM UTC Name: go.m Size: 86B By: None
<http://savannah.gnu.org/bugs/download.php?file_id=40568>
_______________________________________________________
Reply to this item at:
<http://savannah.gnu.org/bugs/?50924>
_______________________________________________
Message sent via/by Savannah
http://savannah.gnu.org/
- [Octave-bug-tracker] [bug #50924] Different result between range operation and vector operation,
anonymous <=