guix-devel
[Top][All Lists]
Advanced

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Failing CI evaluation for staging branch


From: Guillaume Le Vaillant
Subject: Re: Failing CI evaluation for staging branch
Date: Mon, 05 Oct 2020 19:10:25 +0200
User-agent: mu4e 1.4.13; emacs 27.1

Guillaume Le Vaillant <glv@posteo.net> skribis:

> Guillaume Le Vaillant <glv@posteo.net> skribis:
>
>> Ludovic Courtès <ludo@gnu.org> skribis:
>>
>>> Hi Guillaume,
>>>
>>> Guillaume Le Vaillant <glv@posteo.net> skribis:
>>>
>>>> Currently no substitutes are built for the testing branch because the
>>>> evaluation fails. The log at https://ci.guix.gnu.org/eval/16794/log/raw
>>>> ends with:
>>>
>>> You mean the ‘staging’ branch?
>>>
>>
>> Yes, I meant 'staging'. I often type 'testing' instead of 'staging',
>> probably that pesky muscle memory!.
>>
>>>> guix/inferior.scm:247:2: ERROR:
>>>>   1. &inferior-exception:
>>>> [...]
>>>>
>>>> If I understand this correctly, there's a '#:builder' keyword somewhere
>>>> that is causing a problem. Does someone know where it can come from, or
>>>> how to fix the issue?
>>>
>>> Right.  I’d look at guix/build-system/asdf.scm:279:2 on that branch (per
>>> the inferior stack trace above).  Does that give useful info?
>>
>> I didn't see any obvious problem in that file; the strange thing is that
>> 'make', 'make as-derivation' and './pre-inst-env guix build ...' all
>> work fine.
>>
>> In a local branch I merged the current master (3699ed6) into staging
>> (de96ed1) and I'm going to try to start a local cuirass daemon to see
>> wether I can reproduce the issue or not.
>>
>> Given that merging master in staging hasn't been done in a while, should
>> I also push my updated staging branch, or maybe someone is already
>> working on it?
>
> Ok, I started a local Cuirass, I reproduced the evaluation failure, and
> I think I found the problem: Cuirass was choking on the definition of
> the ecl-slynk package. I fixed it and know the evaluation has
> been 'In progress...' for 15 minutes.
> Then, if the evaluation completes successfully, and if there are no
> objections, I'll push the updated staging branch.

The evaluation succeeded on my local Cuirass. Fix pushed to staging as
b6c55a723fab94bbf710c331fe62d839fb0bf6ad.

Attachment: signature.asc
Description: PGP signature


reply via email to

[Prev in Thread] Current Thread [Next in Thread]