[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: Release schedule for 2.20
From: |
Werner LEMBERG |
Subject: |
Re: Release schedule for 2.20 |
Date: |
Wed, 09 May 2018 17:50:06 +0200 (CEST) |
> On my GUB build machine (4 core hyperthreaded i7, 8 Gigs, SSD) an
> incremental build (i.e. with a stable version of GUB with the
> toolset all up to date) takes around one to one and a half hours.
> If GUB needs updating, it can, as you say, take over 6 hours even on
> that machine. The upload is then a few Gigs and on my old broadband
> this took around 6 hours to upload. My shiny VDSL connection does
> it in about 5 minutes. So a complete GUB rebuild is feasible.
> However, I'm not sure that was what was requested. A simple Linux
> binary in a specific location of Lilypond.org would be fairly
> straightforward - about 2 minutes for the build and very quick
> upload.
What about setting up GUB (with LilyPond) on https://hydra.nixos.org/?
Other GNU projects like Emacs are also hosted there for daily
builds, so it should be easy to get lilypond registered there...
https://nixos.org/hydra/
Werner
- Re: Release schedule for 2.20, (continued)
- Re: Release schedule for 2.20, David Kastrup, 2018/05/09
- Re: Release schedule for 2.20, Phil Holmes, 2018/05/09
- Re: Release schedule for 2.20, Malte Meyn, 2018/05/09
- Re: Release schedule for 2.20, Lukas-Fabian Moser, 2018/05/09
- Re: Release schedule for 2.20, Phil Holmes, 2018/05/09
- Re: Release schedule for 2.20, David Kastrup, 2018/05/09
- Re: Release schedule for 2.20, Phil Holmes, 2018/05/09
- Re: Release schedule for 2.20, Lukas-Fabian Moser, 2018/05/09
- Re: Release schedule for 2.20,
Werner LEMBERG <=
- Re: Release schedule for 2.20, David Kastrup, 2018/05/09
- Re: Release schedule for 2.20, Werner LEMBERG, 2018/05/09