|
From: | Bob Friesenhahn |
Subject: | Re: [libtool 2.2] testsuite: 19 35 36 44 45 46 48 49 50 51 52 53 60 61 62 64 failed [GNU/Linux PowerPC] |
Date: | Thu, 6 Mar 2008 13:43:15 -0600 (CST) |
On Thu, 6 Mar 2008, Peter O'Gorman wrote:
I think the test for a working GCJ should be in libtool, and unset GCJ, avoid adding the tag etc.if it is found to be nonfunctional. We would have to issue a warning during configure or something. Does not look to be quite as easy as this patch though, if you want to apply this one as a stop-gap measure, that is fine.
If libtool is integrated into a package and the package declares that it needs a Java compiler, then failure to pass basic tests should cause configure to quit with an error (similar to the way configure fails if the C compiler does not work). If libtool is built stand-alone (as in our distribution) then there should be a warning but the user should still be able to build and install libtool.
Bob ====================================== Bob Friesenhahn address@hidden, http://www.simplesystems.org/users/bfriesen/ GraphicsMagick Maintainer, http://www.GraphicsMagick.org/
[Prev in Thread] | Current Thread | [Next in Thread] |